Project Cargo & Heavy Lift India
Specialised project cargo handling for oversized, overweight, and complex shipments from India. From route surveys to port coordination, we manage every detail of your heavy lift logistics.
What you need to know
Specialised project cargo handling for oversized, overweight, and complex shipments from India. From route surveys to port coordination, we manage every detail of your heavy lift logistics.
What is Project Cargo?
Project cargo refers to large, heavy, or complex shipments that cannot be transported in standard containers. This includes industrial machinery, power plant equipment, oil and gas components, wind turbine parts, and construction equipment. Project cargo requires specialised planning, equipment, and expertise.
Our Project Cargo Services
We provide end-to-end project cargo management: feasibility studies and route surveys, heavy-lift planning and method statements, special vessel chartering (heavy-lift vessels, ro-ro ships), on-site supervision during loading/unloading, customs clearance for temporary imports/exports, and multimodal coordination (road + sea + rail).
Equipment & Capabilities
Through our partner network, we access hydraulic trailers, modular transporters, gantry cranes, and heavy-lift vessels with capacity up to 2,000 tonnes. We handle cargo dimensions up to 30m length, 8m width, and 500+ tonnes weight.
Industries We Serve
Power generation (turbines, transformers, boilers), oil and gas (drilling equipment, pipelines), cement and steel (kilns, crushers, rolling mills), infrastructure (bridge sections, tunnel boring machines), and renewable energy (wind blades, solar panel frames).
Ready to ship?
Get a practical quote with customs-ready execution from a Licensed CHA with 25+ years of experience.
Get My Landing Cost in 2 Hours →Frequently Asked Questions
What is the maximum weight you can ship?
Through our heavy-lift vessel partners, we can handle single pieces up to 2,000 tonnes. For extremely heavy cargo, we design bespoke lifting and securing plans.
How long does project cargo shipping take?
Project cargo requires 2โ6 weeks of planning before shipment. Transit time depends on the route and vessel availability. We provide detailed timelines during the planning phase.
Do you handle installation at destination?
We coordinate with local rigging and installation teams at destination. While we don't directly install equipment, we manage the entire logistics chain up to the installation site.
What documents are needed for project cargo?
In addition to standard shipping documents, project cargo requires method statements, lifting plans, cargo securing plans, and sometimes special permits for oversized road transport.